Lake Sybelia Elementary School

This comprehensive renovation project included a 25,000 SF classroom addition, new front entrance, and complete renovation of the existing 40-year old building. The 20 month schedule was completed in several phases to keep the students from having to vacate the campus during the renovations. Name and Location of Project:Lake Sybelia Elementary School, 600 Sandspur Rd., […]

Maynard Evans HS

This tilt-wall Schenkel Shultz designed high school is a complete reconstruction project on an existing campus. The original school was built in 1958 and has been completely demolished. New buildings are being constructed for Administration, Media Center, Auditorium, Cafeteria, Gymnasium, three 3-story classroom buildings, and a new field house. Also included are new sidewalks, parking […]

Gotha Middle School

The contract scope included demolition of Boiler & Hot water piping, installation of new electric duct heaters, replacement of CWSR valves & gages, replacement of condenser water pumps, cooling towers, installation of new split A/C units at MDF rooms, replacement of Fire Alarm system, installation of new site lighting, new clean power receptacles, new CAT6 […]

Winter Park High School Kitchen Modifications

This project consisted of abatement of existing acoustical ceiling tile and the reconfiguration of HVAC, Plumbing, and Mechanical/Fire Protection systems serving both food packaging machine and a walk-In cooler. Each system required ancillary components. A 5-hp compressor and its air quality components were installed to provide low humidity, highly controlled air to the food packaging […]

Chain of Lakes MS Capital Renewal

This project consists of adding vision window at serving line wall in the cafeteria; replacing acoustical sound attenuation panels and acoustical ceiling tile in the music building and cafeteria; replacing scoreboard and sound system, and refinishing wood floor, including re-striping, for Gymnasium; replacing energy management system (EMS) controls in all buildings campus-wide; test and balance of the […]

Hunter’s Creek Middle School

The contract scope included demolition of Boiler & Hot water piping, installation of new electric duct heaters, replacement of CWSR valves & gages, replacement of condenser water pumps, cooling towers, installation of new split A/C units at MDF rooms, replacement of Fire Alarm system, installation of new site lighting, new clean power receptacles, new CAT6 […]

Piedmont Lake Middle School

Project consisted of renovation and component replacement to the existing campus’s to eliminate life/safety/fire, operational and technology deficiencies and to provide improved facilities. The work included demolition, replacement, and renovations of selected existing systems including mechanical (HVAC), electrical, fire alarm, and technology systems. Also included were the replacements of exterior flashing, roof and exterior wall […]

Apopka Memorial Middle School

The Apopka Memorial Middle School project included major demolition of 3 buildings, interior demolition of 6 buildings, and new construction of a 2-story and a one-story classroom building. A new courtyard was also designed on the south end of the campus focusing around the dedicated Shirley Sanders Oak tree. Name and Location of Project: Apopka […]

Lake Silver Elementary School

The Lake Silver Elementary School project consisted of construction of a new one story classroom, administration, dining, multipurpose, and media building, and remodeling and renovations to existing buildings. Site Improvements were also included in the scope. Name and Location of Project: Lake Silver Elementary School 2401 North Rio Grande Avenue Orlando, FL 32804 Market: K-12 […]

Washington Shores Elementary School

New school construction consisting of the demo of the existing school and infrastructure of and constructing of a 2-story school to include admin offices, cafeteria and kitchen, media center and classrooms. Construction also includes new retention pond, sanitary, water, gas, fire lines, parking lots, bus turnaround, site irrigation, new athletic field, basketball courts, playground equipment, […]