Winter Park High School Kitchen Modifications

This project consisted of abatement of existing acoustical ceiling tile and the reconfiguration of HVAC, Plumbing, and Mechanical/Fire Protection systems serving both food packaging machine and a walk-In cooler. Each system required ancillary components. A 5-hp compressor and its air quality components were installed to provide low humidity, highly controlled air to the food packaging machine. Moreover, the walk-in cooler was serviced by a temperature and pressure-controlled condenser which was remotely located from the cooler unit. Finally, the fire protection system was reconfigured to monitor this newly re-purposed area. This particular operation is one of the central food processing locations now serving Orange County Public Schools.


Name and Location of Project: Winter Park High School Kitchen Modification 2100 Summerfield Road Winter Park, FL 32792
Market: K-12
Client: Orange County Public Schools
Date Project was Completed: August 2014
Size of Project: 383 SF
Cost of Project: $168,005

Project Gallery:

v c